Al-Kheetan, M J, Rahman, M M and Chamberlain, D A (2018) Remediation and protection of masonry structures with crystallising moisture blocking treatment. International Journal of Building Pathology and Adaptation, 36(01), 77–92.

Ali, A S, Azmi, N F and Baaki, T K (2018) Cost performance of building refurbishment works: the case of Malaysia. International Journal of Building Pathology and Adaptation, 36(01), 41–62.

Enshassi, A, Ayash, A and Mohamed, S (2018) Key barriers to the implementation of energy-management strategies in building construction projects. International Journal of Building Pathology and Adaptation, 36(01), 15–40.

Hosseini, M R, Roelvink, R, Papadonikolaki, E, Edwards, D J and Pärn, E (2018) Integrating BIM into facility management. International Journal of Building Pathology and Adaptation, 36(01), 2–14.

  • Type: Journal Article
  • Keywords: Building information modelling (BIM); Facility management; Information requirements; Typology matrix;
  • ISBN/ISSN: 2398-4708
  • URL: https://doi.org/10.1108/IJBPA-08-2017-0034
  • Abstract:
    Integrating building information modelling (BIM) into facility management (FM) has generated fervent debate within the extant literature given an increasing realisation amongst practitioners that the majority of BIM benefits reside within the whole lifecycle management. Converting a building’s in-use data and information into tangible business knowledge to augment FM performance is crucial for business growth and prosperity. Yet curiously, scant academic attention has been paid in investigating the data and information hand-over process through BIM required by FM. The purpose of this paper is to address this knowledge gap. Design/methodology/approach The research approach adopted draws upon pertinent BIM in the FM literature and a qualitative discourse accrued via focus group meetings of Australian FM experts. Findings The study’s findings are presented as a data and information typology matrix that captures the associations among different forms of data ownership, FM service delivery categories and data and information typologies for using BIM in FM. Practical implications The analysis results will prove invaluable for policy-makers, researchers and practitioners by providing a relevant data and information typology and capturing the complex associations in the process of integrating BIM into FM. Originality/value This study contributes to the field by providing a better understanding of different forms of data and information, required by members of a FM team. The original insight shared here is the necessity to consider a distinctive array of interests and the potential for using different forms of data and information when integrating BIM into FM.

Ogbeifun, E, Mbohwa, C and Pretorius, J C (2018) Developing an effective renovation plan: the influence of data collection tools. International Journal of Building Pathology and Adaptation, 36(01), 63–76.

Opawole, A and Jagboro, G O (2018) Compensation mechanisms for minimizing private party risks in concession-based public-private partnership contracts. International Journal of Building Pathology and Adaptation, 36(01), 93–120.